About a-team Marketing Services
The knowledge platform for the financial technology industry
The knowledge platform for the financial technology industry

A-Team Insight Blogs

ADVA Expands Open Line System to Ease Data Centre Interconnect Bottlenecks

Subscribe to our newsletter

ADVA has introduced an expanded FSP 3000 open line system (OLS), providing customers with access to the data centre interconnect (DCI) OLS that includes integrated optical time-domain reflectometer (OTDR) capability and allows optical fibre monitoring in a live network and reduces DCI bottlenecks.

Hyperscale DCI networks consist of short, wide pipes that connect from point-to-point, meaning that the interworking between each terminal and line system does not necessitate as much fine-tuning. The compact and integrated OTDR that monitors the fibre plant while providing real-time information can eliminate the need for additional test and measurement equipment and reduce the time to allocate a fibre fault. As a result, the OTDR will decrease mean time for repair.

Stephan Rettenberger, senior vice president of marketing and investor relations at ADVA explains: “In many cases, data centres outgrow the buildings where they first started and most hyperscalers run architectures where multiple warehouse size buildings around a metropolitan area are interconnected to act like one super-hyperscale data centre. If the networking capacity between these data centres is too small, the performance of the data centre cluster will suffer and all the millions of dollars invested in the latest generation of compute and storage technology will be underutilised. So it is important that the DCI does not become a bottleneck in the clustered/interconnected architecture.”

Subscribe to our newsletter

Related content

WEBINAR

Upcoming Webinar: Reviewing the Latency Landscape and the Next Generation of Ultra-Low Latency Infrastructure

Date: 17 September 2026 Time: 10:00am ET / 3:00pm London / 4:00pm CET Duration: 50 minutes Ultra-low latency is no longer the preserve of a handful of proprietary trading firms. As new asset classes electronify, data volumes surge, and regulatory expectations around execution quality and resilience tighten, the performance demands on trading infrastructure are broadening...

BLOG

Is Speed No Longer the Hard Part in Trading Infrastructure?

A panel of high-performance trading infrastructure architects, convened at A-Team Group’s recent TradingTech Summit New York to discuss the blueprint for speed, spent remarkably little of its time talking about speed. The tick-to-trade race still runs, and firms still shave nanoseconds where a strategy justifies it, but raw latency is the part this end of...

EVENT

Digital Assets & Tokenisation Summit, New York

A-Team Group’s Digital Assets & Tokenisation Summit spotlights how global financial leaders are rapidly embracing programmable tokenised assets and DLT networks to achieve real-time, 24/7 peer-to-peer transactions.

GUIDE

BCBS 239 Data Management Handbook

Our 2015/2016 edition of the BCBS 239 Data Management Handbook has arrived! Printed copies went like hotcakes at our Data Management Summit in New York but you can download your own copy here and get access to detailed information on the  principles and implications of BCBS 239 on Data Management. This Handbook provides an at-a-glance...